Features and benefits

sustainability icon

Applications

  • Roads – infrastructure, stormwater, asset renewal
  • Rail – stormwater run-off
  • Mining – stormwater and aggressive ground
  • Rural – culverts and land drainage
  • Land development – residential and industrial

Product Properties

_
Size Range

150-900mm
_
_
_

Material

Polypropylene (PP)

PP Material Properties
_
_

Classification

SN8

_
Temperature

Suitable for continuous service temperatures up to 60ºC and short-term discharge of up to 90ºC.
_
_

Chemical

Chemical Resistance
_
_

_

Location

Below and above ground installation

Discover the performance capabilities of StormPRO by Vinidex

 

Did you know?

StormPRO has a proven track record –
having been used by Vinidex customers on numerous projects. To discover some of the projects delivered with StormPRO talk to
our specification team.

Contact us

How do StormPRO pipes compare against Reinforced Concrete Pipes?

StormPRO by Vinidex provides benefits that traditional concrete pipes can not match.

More versatile

Vinidex StormPRO pipes offer greater versatility compared to concrete pipes. When conditions are suitable, Vinidex SN8 pipes can replace various classes of concrete pipes, simplifying the need for multiple pipe classes on site.

Lightweight for fast installation

StormPRO pipes are lighter and more flexible than reinforced concrete pipe, resulting in less than a quarter of the time required to install.¹,²

Project Savings

Compared to reinforced concrete pipe, on average choosing StormPRO results in a 31% reduction in the overall installed cost.¹

Crack Resistant

Due to the polypropylene material properties of StormPRO pipes and it’s ability to adapt to soil movement, cracking does not occur. Under the similar conditions, where soil movement occurs, concrete pipes could potentially show signs of cracking.

Smooth and efficient water flow

StormPRO pipes have a smoother internal surface increasing the efficiency of water flow & hydraulic performance by 27%, therefore a reduced pipe diameter may be achievable for StormPRO, resulting in additional project cost savings.³

Products

Certifications & Approvals
Installation Video
Installation Guides
Projects
Technical Datasheets
Product Downloads

Environmental Product Declaration

VIN101 StormPRO Polypropylene Pipes

Safety Data Sheets (SDS)

Click here to access our Safety Data Sheets page.

Standards for Polypropylene pipe

StormPRO® polypropylene pipes are manufactured in accordance with AS/NZS 5065:2005 Polyethylene and polypropylene pipes and fittings for drainage and sewer applications.

StormPRO® and StormFLO® Installation Video

Standards

  • StormPRO® polypropylene pipes are manufactured in accordance with AS/NZS 5065:2005 Polyethylene and polypropylene pipes and fittings for drainage and sewer applications.
  • For installation guidance, please refer to AS/NZS 2566.2 Buried flexible pipelines, Part 2: Installation.

Vinidex Installation Guide

Springridge Housing Estate Drainage Project - Wallan, VIC

Peaceful Avenue Drainage Project - Armstrong Creek, VIC

Internal Pipe Inspection - StormPRO under roads

A housing development project showcases the benefits of the light internal wall of StormPRO for internal pipe examination…read more.

Dairy Farm Drainage - Koroit, VIC

This project required quick removal of on-farm waste-water through utilising a product that was tough, easy to install and freely available from their local farm supplier….Read more

Gen Fyansford Estate - Fyansford, VIC

This project required deep stormwater mains with a specific length for safe installation. The selected product also needed to exceed council standards and suit under road installation…Read more

Wallan Place - Wallan, VIC

In collaboration with Vinidex, Aus Pits have developed a new system of pipe blockouts to suit the external size of StormPRO® pipes…Read more

Utah Point Road Drainage - Port Hedland, WA

The harsh conditions of Port Hedland required a product to sustain aggressive groundwater and mine traffic carrying 100+ tonnes of Iron Ore. There were also strict construction deadlines…Read more

Mine Rehabilitation for Hazelwood Mine - Latrobe Valley, VIC

Extreme environments require a tough and durable solution – polypropylene offers high resistance to abrasion and resistance to numerous chemicals found in the mining environment…Read more

Product Catalogues

Certifications & Approvals

Environmental Product Declaration

VIN101 StormPRO Polypropylene Pipes

Safety Data Sheets (SDS)

Click here to access our Safety Data Sheets page.

Standards for Polypropylene pipe

StormPRO® polypropylene pipes are manufactured in accordance with AS/NZS 5065:2005 Polyethylene and polypropylene pipes and fittings for drainage and sewer applications.

Installation Video

StormPRO® and StormFLO® Installation Video

Installation Guides

Standards

  • StormPRO® polypropylene pipes are manufactured in accordance with AS/NZS 5065:2005 Polyethylene and polypropylene pipes and fittings for drainage and sewer applications.
  • For installation guidance, please refer to AS/NZS 2566.2 Buried flexible pipelines, Part 2: Installation.

Vinidex Installation Guide

Projects

Springridge Housing Estate Drainage Project - Wallan, VIC

Peaceful Avenue Drainage Project - Armstrong Creek, VIC

Internal Pipe Inspection - StormPRO under roads

A housing development project showcases the benefits of the light internal wall of StormPRO for internal pipe examination…read more.

Dairy Farm Drainage - Koroit, VIC

This project required quick removal of on-farm waste-water through utilising a product that was tough, easy to install and freely available from their local farm supplier….Read more

Gen Fyansford Estate - Fyansford, VIC

This project required deep stormwater mains with a specific length for safe installation. The selected product also needed to exceed council standards and suit under road installation…Read more

Wallan Place - Wallan, VIC

In collaboration with Vinidex, Aus Pits have developed a new system of pipe blockouts to suit the external size of StormPRO® pipes…Read more

Utah Point Road Drainage - Port Hedland, WA

The harsh conditions of Port Hedland required a product to sustain aggressive groundwater and mine traffic carrying 100+ tonnes of Iron Ore. There were also strict construction deadlines…Read more

Mine Rehabilitation for Hazelwood Mine - Latrobe Valley, VIC

Extreme environments require a tough and durable solution – polypropylene offers high resistance to abrasion and resistance to numerous chemicals found in the mining environment…Read more
Technical Datasheets
Product Downloads

Product Catalogues

¹. Calculated RCP Class 2 weights against similar ID pipes for StormPRO and averaged over the StormPRO range DN300 to DN900.

². This comparison is based on an independent assessment by The Engineering and Design Company Pty Ltd (E&DCo) of the installation of StormPRO SN8 twin wall corrugated PP stormwater pipe and Class 2 RCP. E&DCo relied on the requirements of Australian Standards (AS/NZS 2566.2 “Buried flexible pipelines – Installation” and AS/NZS 3725 “Design for installation of buried concrete pipes”) and their own database of construction costs in preparing this assessment. The following site conditions have been assumed:
– pipes installed in straight, uninterrupted lengths trench geometry to the relevant Australian Standard
– cover height 750mm
– no groundwater or other adverse ground conditions.
– comparison data has been rounded to the nearest whole number where applicable

³. RCP results in 27% more head loss than StormPRO in this example.
DNS300 SN8 StormPRO – Flow Rate 100L/s
DN300 Class 2 RCP – Flow Rate 100L/s